This page last reviewed April 16, 2013

 Current Certification and Test Procedures

 Current Certification and Test Procedures

Stationary Source Test Methods, Volume 2, Certification and Test Procedures for Gasoline Vapor Recovery Systems, can be downloaded in two formats MS Word and Adobe Acrobat.  The links in the table below provide access to individual sections of Volume 2 in uncompressed MS Word or Adobe Acrobat (.PDF) format. 

 To access Volume 2 Test Method archives, advisories and equivalent procedures please click here.

For questions or comments related to these documents, or to request a bound hard copy volume, please contact Kevin Mongar of the Engineering and Certification Branch at (916) 322-2502 or via e-mail at kmongar@arb.ca.gov.

Test Method
Number

Test Method Title

MS Word

PDF
Format

Date of Adoption or Amendment

D-200

Definitions for Vapor Recovery

145K

78K

Jan 9, 2013

CP-201

Certification Procedure for Vapor Recovery Systems at Dispensing Facilities


576K


432K

Jan 9, 2013

TP-201.1

Volumetric Efficiency for Phase I Systems

1028K

187K

July 26, 2012

TP-201.1A

Emission Factor for Phase I Systems at Dispensing Facilities

1,014K

154K

February 1, 2001

TP-201.1B

Static Torque of Rotatable Phase I Adaptors

121K

128K

October 8, 2003

TP-201.1C

Leak Rate of Drop Tube/Drain Valve Assembly

200K

197K

October 8, 2003

TP-201.1D

Leak Rate of Drop Tube Overfill Protection Devices and Spill Container Drain Valves

278K

221K

October 8, 2003

TP-201.1E

Leak Rate and Cracking Pressure of Pressure/Vacuum Vent Valves

169K

128K

October 8, 2003

TP-201.1E CERT

Leak Rate and Cracking Pressure of Pressure/Vacuum Vent Valves

176K

96K

May 25, 2006

TP-201.2

Efficiency and Emission Factor for Phase II Systems

3623K

1147K

July 26, 2012

TP-201.2A

Determination of Vehicle Matrix for Phase II Systems

97K

78K

July 26, 2012

TP-201.2B

Flow and Pressure Measurement of Vapor Recovery Equipment

1,046K

570K

October 8, 2003

TP-201.2C

Spillage from Phase II Systems

197K

110K

February 1, 2001

TP-201.2D

Post-Fueling Drips from Nozzles

314K

156K

October 8, 2003

TP-201.2E

Gasoline Liquid Retention in Nozzles and Hoses

120K

43K

February 1, 2001

TP-201.2F

Pressure-Related Fugitive Emissions

98K

129K

October 8, 2003

TP-201.2G

Bend Radius Determination for Underground Storage Tank Vapor Return Piping

1,420K

92K

May 25, 2006

TP-201.2H

Determination of Hazardous Air Pollutants from Vapor Recovery Processors

256K

73K

February 1, 2001

TP-201.2I

Test Procedure for In-Station Diagnostic Systems

92K

112K

July 26, 2012

TP-201.2J

Pressure Drop Bench Testing of Vapor Recovery Components

467K

144K

July 26, 2012

TP-201.3

Determination of 2 Inch WC Static Pressure Performance of Vapor Recovery Systems of Dispensing Facilities

359K

166K

July 26, 2012

TP-201.3A

Determination of 5 Inch WC Static Pressure Performance of Vapor Recovery Systems of Dispensing Facilities

80K

107K

April 12, 1996

TP-201.3B

Determination of Static Pressure of Vapor Recovery Systems of Dispensing Facilities with Above-Ground Storage Tanks

93K

118K

April 12, 1996

TP-201.3C

Determination of Piping Connections to Underground Gasoline Storage Tanks (Tie-Tank Test)

54K

  87K

March 17, 1999

TP-201.4

Dynamic Back Pressure

1,182K

107K

July 3, 2002

TP-201.5

Air to Liquid Volume

1,453K

123K

February 1, 2001

TP-201.6

Determination of Liquid Removal of Vapor Recovery Systems of Dispensing Facilities

54K

27K

April 28, 2000

TP-201.6C

Compliance Determination of Liquid Removal Rate

180K

50K

July 3, 2002

TP-201.7

Continuous Pressure Monitoring

182K

98K

October 8, 2003

CP-202

Certification Procedure for Vapor Recovery Systems of Bulk Plants

87K

221K

March 17, 1999

TP-202.1

Determination of Emission Factors of Vapor Recovery Systems of Bulk Plants

145K

239K

March 17, 1999

CP-203

Certification Procedure for Vapor Recovery Systems of Terminals

87K

226K

March 17, 1999

TP-203.1

Determination of Emission Factors of Vapor Recovery Systems of Terminals

147K

233K

March 17, 1999

CP-204

Certification Procedure for Vapor Recovery Systems of Cargo Tanks

153K

339K

March 17, 1999

TP-204.1

Determination of Five Minute Static Pressure Performance of Vapor Recovery Systems of Cargo Tanks

106K

135K

March 17, 1999

TP-204.2

Determination of One Minute Static Pressure Performance of Vapor Recovery Systems of Cargo Tanks

505K

1,020K

March 17, 1999

TP-204.3

Determination of Leaks

840K

220K

March 17, 1999

CP-205

Certification Procedure for Vapor Recovery Systems of Novel Facilities

122K

185K

March 17, 1999

TP-205.1

Determination of Efficiency of Phase I Vapor Recovery Systems of Novel Facilities

259K

370K

March 17, 1999

TP-205.2

Determination of Efficiency of Phase II Vapor Recovery Systems of Novel Facilities

303K

362K

March 17, 1999

CP-206

Certification Procedure for Vapor Recovery Systems at Gasoline Dispensing Facilities Using Aboveground Storage Tanks

2966K

824K

Jan 9, 2013

TP-206.1

Determination of Emission Factor for Standing Loss Control Vapor Recovery Systems Using Temperature Attenuation Factor at Gasoline Dispensing Facilities Using Aboveground Storage Tanks

623K

201K

May 2, 2008

TP-206.2

Determination of Emission Factor for Standing Loss Control Vapor Recovery Systems Using Processors at Gasoline Dispensing Facilities Using Aboveground Storage Tanks

151K

93K

May 2, 2008

TP-206.3

Determination of Static Pressure Performance of Vapor Recovery Systems at Gasoline Dispensing Facilities Using Aboveground Storage Tanks

1478K

93K

July 26, 2012

Top of page 

Gasoline Vapor Recovery Systems Test Methods
-----------------------
A department of the California Environmental Protection Agency
preload