Number Description Date
G-70-213 Cover Letter 01/21/09
G-70-213 Modification of Operative Dates Relating to the Finding that EVR Standing Loss Control Phase I, Phase II Vapor Recovery Systems, and In-Station Diagnostics (ISD) Are Not Commercially Available for Use with Aboveground Storage Tanks (AST) 12/31/08
 G-70-102-A  Certification of a Phase I Vapor Recovery System for Aboveground Storage Tanks with less than 40,000 Gallons Capacity for Gasoline or Gasoline/Methanol Blended Fuels  5/25/93 
 G-70-116-F  ConVault Aboveground Tank Vapor Recovery System  11/30/95 
G-70-128 Bryant Fuel Cell Aboveground Tank Vapor Recovery System 8/27/90
G-70-130A Petrovault Aboveground Tank Vapor Recovery System 2/26/93
G-70-131A Tank Vault Aboveground Tank Vapor Recovery System 3/17/92
G-70-132-B Supervault Aboveground Tank Vapor Recovery System 5/16/95
G-70-136 FireSafe Aboveground Tank Vapor Recovery System 4/15/91
G-70-137 FuelSafe Aboveground Tank Vapor Recovery System 10/4/91
G-70-138 Phase II Vapor Recovery Systems Installed on Gasoline Bulk Plants/Dispensing Facilities with Aboveground Tanks 1/14/92
G-70-139 Addition to the Certification of the Hirt Model VCS-200 Phase II Vapor Recovery System 3/17/92
G-70-140-A Integral Phase I and Phase II Aboveground Tank Configurations with the Healy Phase II Vapor Recovery System 7/1/92
G-70-142-B Phase I Vapor Recovery System for Aboveground Gasiline Storage Tanks 9/9/94
G-70-143 P/T Vault Aboveground Tank Vapor Recovery System 8/7/92
G-70-147-A New United Motors Manufacturing, Incorporated Phase II Vapor Recovery System at the Fremont, California Assembly Plant 7/11/96
G-70-148-A Lube Cube Aboveground Tank Vapor Recovery System 5/4/95
G-70-152 Moiser BrothersTanks and Manufacturing Aboveground Tank Vapor Recovery System 10/31/93
G-70-155 Petroleum Marketing Aboveground Tank Vapor Recovery System 3/12/94
G-70-156 Ecovault Aboveground Tank Vacuum Assist Vapor Recovery System 5/23/94
G-70-157 Ecovault Aboveground Tank Balance Vapor Recovery System 5/23/94
G-70-158-A Firesafe Aboveground Tank Vapor Recovery System 5/24/95
G-70-160 Above Ground Tank Vault Vapor Recovery System 11/9/94
G-70-161 Hoover Containment Systems, Incorporated Fuelmaster Aboveground Tank Vapor Recovery System 11/30/94
G-70-162-A Steel Tank Institute Fireguard Aboveground Tank Vapor Recovery System 2/15/95
G-70-167 EnviroVault Aboveground Tank Vapor Recovery System 1/9/96
G-70-168 Bryant Fuel Systems Phase I Vapor Recovery System 10/15/95
G-70-175 Hasstech VCP-3A Vacuum Assist Phase II Vapor Recovery System for Aboveground Tank Systems 4/18/96
G-70-181-B Hirt VCS400-7 Bootless Nozzle Phase II Vapor Recovery System for Aboveground Storage Tank Systems 04/05/07
G-70-187 Healy Model 400 ORVR Vapor Recovery System for Aboveground Tank Systems 9/13/99
G-70-190 Guardian Containment, Corporation Armor Cast Aboveground Tank Vapor Recovery System 10/8/99
G-70-192 Certification of the Healy Model 400 ORVR Nozzle for Existing Aboveground Storage Tank Systems 11/24/99
G-70-193 Certification of the Hill-Vac Vapor Recovery System for Cargo Tank Motor Vehicle Fueling Systems 12/9/99
G-70-194 Containment Solutions Hoover Vault Aboveground Tank Vapor Recovery System 5/11/00
G-70-195 Cretex Companies, Inc FuelVault Aboveground Tank Vapor Recovery System 3/31/00
G-70-197 Synchrotek Fastflo 3 Phase II Vapor Recovery System 6/25/01
G-70-200-C Oldcastle Aboveground Below-Grade Fuel Vault with Balance Vapor Recovery System and Buried Vapor Return Piping 04/05/07
G-70-201-B Oldcastle Aboveground Below-Grade Fuel Vault with Balance Vapor Recovery System and Trenched Vapor Return Piping 04/05/07
G-70-202-B Oldcastle Aboveground Below-Grade Fuel Vault with Gilbarco VaporVac Phase II Recovery System and Trenched Vapor Return Piping 04/05/07