ARB has developed Enhanced Vapor Recovery (EVR) standards for vapor recovery systems using Aboveground Gasoline Storage Tanks (AST).  On May 2, 2008 the Board approved Certification Procedure CP-206, which describes the procedure for evaluating and certifying ASTs, Standing Loss Control, Phase I and Phase II vapor recovery systems, and components used at Gasoline Dispensing Facilities (GDF). At the same time Test Procedures TP-206.1, TP-206.2, and TP-206.3 were certified in regards to determining compliance with AST EVR system performance standards.



Renewal of Standing Loss Control for Aboveground Storage Tanks (AST) Executive Orders (EO) VR-301-F and VR-302-F, and the Certification of Above Ground Tank (AGT) Vault's Protected AST and Franklin Fueling Systems' (FFS) PV-Zero Pressure Vacuum (P/V) Vent Valve
EOs VR-301-F and VR-302-F have been renewed, extending the certification of listed standing loss control vapor recovery components for an additional four years.  ICI Devoe High Performance Coatings' Devthane 359H and Devthane 379 paints were removed from EO VR-301-F, and the Jensen Precast Armor Cast AST was removed from EO VR-302-F.  The EOs include newly certified AGT Vault's AST and FFS' PV-Zero P/V vent valve.

Letter of Intent: Amending Executive Order (EO) VR-301 To Include Specific Pre-EVR Protected Above Ground Storage Tanks (AST)
ARB staff intends to amend EO VR-301 to include six pre-EVR certified protected ASTs in the list of protected ASTs that meet standing loss control requirements without the addition of a certified coating system.

April 9, 2014 Letter to Fuel Providers and Aboveground Storage Tank Owners
Clarifying the Requirement of a Certified Product Transfer Coupler While Transferring Gasoline to an Aboveground Storage Tank with Phase I EVR.

Letter of Intent: Modern Custom Fabrication, Inc.'s SuperVault Integral Spill Container and Drain Plug
ARB staff will include Modern Customer Fabrication's SuperVault integral spill container and drain plug in the next amendment of Phase I EVR Executive Orders VR-401 (OPW) and VR-402 (Morrison Brothers).

Executive Order G-70-216
Extension of Effective Dates for Existing Aboveground Storage Tanks at Gasoline Dispensing Facilities Due to the Finding that Certified Phase I Enhanced Vapor Recovery Systems are Not Commercially Available.

Letter of Intent: Containment Solutions Inc.'s HooverVault Integral Spill Container and Drain Plug
ARB staff will include CSI's HooverVault integral spill container and drain plug in the next amendment of Phase I EVR Executive Orders VR-401 (OPW) and VR-402 (Morrison Brothers).

Letter of Intent: ConVault's Integral Spill Container, Drain Valve, and Drain Plug
ARB staff will include ConVault's integral spill container, drain valve, and drain plug in the next amendment of Phase I EVR Executive Orders VR-401 (OPW) and VR-402 (Morrison Brothers).

Jensen Precast Armor Vault Tank Model Number Correction Approval Letter #13-02

CSI Hoover Vault Tank Model Correction Approval Letter #13-01

CSI Hoover Vault Tank Model Correction Approval Letter #11-01

CSI Hoover Vault Tank Model Correction Approval Letter #11-02

Advisory 393:
Enhanced Vapor Recovery Systems for New and Existing Aboveground Storage Tanks.

AST EVR Compliance Dates

Rulemaking Documents for Adoption of Proposed Certification and Test Procedures for Aboveground Storage Tank Enhanced Vapor Recovery and Amendment to Efficiency and Emission Factor for Phase II System (June 21-22, 2007 Board Hearing)
- 15-Day Notice with Comment Deadline Extension


Draft Control Technology Demonstration Study on Aboveground Storage Tanks

Proposed Definitions for Vapor Recovery Procedures
(Second Modified Amendments)

Draft Interim Guidelines for Certifying Vapor Recovery Systems Using Above Ground Storage Tanks

Archive
- Documents
- Presentations
- Notices
- Meeting Agendas
- Meeting Minutes

Contact Information:

Questions can be directed to Sam Vogt at (916) 322-8922.

preload