Vapor Recovery Certification
Phase II EVR Executive Orders

This page updated October 28, 2014

Form to Report if Vapor Recovery Equipment or Contractor is Unavailable

- Form in Word (DOC 55K)  
- Form in Acrobat (PDF 70K)


 Number  Description
 VR-201  Assist Phase II EVR System
 VR-202  Assist Phase II EVR System Including ISD System
 VR-001  Franklin Electric, Inc. Acquisition of Healy System Executive Orders
 VR-203  Balance Phase II EVR System
 VR-204  Balance Phase II EVR System Including ISD System
 VR-205  VST Phase II EVR System with HIRT VCS 100 Thermal Oxidizer not Including ISD.
 VR-207  EMCO Wheaton Retail Phase II EVR System with HIRT VCS 100 Thermal Oxidizer not Including ISD.
 VR-208  EMCO Wheaton Retail Phase II EVR System with HIRT VCS 100 Thermal Oxidizer Including ISD.
 VR-209  VST Phase II EVR System with FFS Clean Air Separator Not Including ISD.
G-70-210 Modification of Operative and Effective Dates for Enhanced Vapor Recovery (EVR) Phase II and In-Station Diagnostics on Gasoline Dispensing Facilities with Bulk Plants
G-70-211 Modification of Operative and Effective Dates for Enhanced Vapor Recovery (EVR) Phase II and In-Station Diagnostics on Gasoline Dispensing Facilities with Liquid Condensate Traps
G-70-210
G-70-211
Cover Letter
G-70-212 Modification of Operative and Effective Dates for Enhanced Vapor Recovery (EVR) Phase II and In-Station Diagnostics for E85 Gasoline Dispensing Facilities
G-70-214 Modification of the operative and effective dates for phase II vapor recovery systems, including in-station diagnostics (ISD), for use with gasoline dispensing facilities (GDF) that include liquid condensate traps (LCT)
G-70-215
Modification of operative and effective dates for enhanced vapor recovery (EVR) Phase II and in-station diagnostics on gasoline dispensing facilities with bulk plants.
preload