2002 Enhanced Vapor Recovery Technical Review

This page last reviewed April 28, 2008

RULEMAKING TO CONSIDER AMENDMENTS TO VAPOR RECOVERY
SYSTEM CERTIFICATION AND TEST PROCEDURES FOR
GASOLINE MARKETING OPERATIONS AT SERVICE STATIONS

(December 12, 2002 Hearing)


FINAL APPROVAL / OAL ACTION
The final rulemaking package was filed with OAL on October 21, 2003. The final rulemaking package was approved by OAL and filed with the Secretary of State on December 5, 2003. The regulation will become effective on January 4, 2004.

ADOPTED REGULATIONS AND MATERIALS SUBMITTED TO OAL
  • Executive Order G-03-060 (PDF - 4K)

  • Final Regulation Order (PDF - 13K)

    • D-200: Definitions for Vapor Recovery Procedures (Amended) (PDF - 33K)

    • CP-201: Certification Procedure for Vapor Recovery Systems at Gasoline Dispensing Facilities (Amended) (PDF - 199K)

    • TP-201.1: Volumetric Efficiency of Phase I Vapor Recovery Systems (Amended) (PDF - 110K)

    • TP-201.1: Volumetric Efficiency of Phase I Vapor Recovery Systems (Repealed) (PDF - 73K)

    • TP-201.1B: Static Torque of Rotatable Phase I Adaptors (Amended) (PDF - 38K)

    • TP-201.1C: Leak Rate of Drop Tube / Drain Valve Assembly (Amended) (PDF - 99K)

    • TP-201.1D: Leak Rate of Drop Tube Overfill Prevention Devices and Spill Container Drain Valves (Amended) (PDF - 120K)

    • TP-201.1E: Leak Rate and Cracking Pressure of Pressure / Vacuum Vent Valves (For Adoption) (PDF - 37K)

    • TP-201.2: Efficiency and Emission Factor for Phase II Systems (Amended) (PDF - 19K)

    • TP-201.2B: Flow and Pressure Measurement of Vapor Recovery Equipment (Amended) (PDF - 306K)

    • TP-201.2D: Post-Fueling Drips From Nozzles (PDF - 146K)

    • TP-201.2F: Pressure Related Fugitive Emissions (Amended)(PDF - 47K)

    • TP-201.2F: Pressure-Related Fugitive Emissions (Repealed) (PDF - 76K)

    • TP-201.2G: Bend Radius Determination for Underground Storage Tank Vapor Return Piping (For Adoption) (PDF - 63K)

    • TP-201.2I: Test Procedure for In-Station Diagnostic Systems (For Adoption) (PDF - 47K)

    • TP-201.2J: Pressure Drop Bench Testing of Vapor Recovery Components (For Adoption) (PDF - 60K)

    • TP-201.7: Continuous Pressure Monitoring (For Adoption) (PDF - 31K)

  • Final Statement of Reasons (FSOR) (PDF - 90K)

  • Updated Informative Digest (PDF - 12K)

  • Notice of Decision and Response to Significant Environmental Issues (PDF - 4K)
A business or person submitting a comment to a proposed regulation or proposed amendment or repeal of a regulation or any person who specifically requests it has the right to request a copy of the Final Statement of Reasons (FSOR). Upon its completion, the Final Statement of Reasons (FSOR) will be available and copies may be requested from the agency contact persons, or may be obtained in electronic form from this web page.

EMERGENCY FILING (July 2, 2003)
The emergency regulation was approved and filed with the Secretary of State on July 3, 2003, and became effective the same day and will expire on November 1, 2003.
EMERGENCY FILING (March 7, 2003)
The emergency regulation was approved and filed with the Secretary of State on March 13, 2003, and became effective the same day and will expire on July 12, 2003.

HEARING ACTION AND SUPPLEMENTAL 15-DAY NOTICES
Posted July 17, 2003:
Amended Procedures
  • D-200: Definitions for Vapor Recovery Procedures (PDF - 39K)

  • CP-201: Certification Procedure for Vapor Recovery Systems at Gasoline Dispensing Facilities (PDF - 220K)

  • TP-201.1E: Leak Rate and Cracking Pressure of Pressure / Vacuum Relief Vent Valves (PDF - 58K)

  • TP-201.2D: Post-Fueling Drips From Nozzles (PDF - 153K)

  • TP-201.2F: Pressure Related Fugitive Emissions (PDF - 71K)
Posted May 8, 2003:
Amended Procedures
  • D-200: Definitions for Vapor Recovery Procedures (PDF - 36K)

  • CP-201: Certification Procedure for Vapor Recovery Systems at Gasoline Dispensing Facilities (PDF - 211K)

  • TP-201.1C: Pressure Integrity of Drop Tube / Drain Valve Assembly; Revised Title: Leak Rate of Drop Tube / Drain Valve Assembly (PDF - 120K)

  • TP-201.1D: Pressure Integrity of Drop Tube Overfill Prevention Device; Revised Title: Leak Rate of Drop Tube Overfill Prevention Device and Spill Container Drain Valves (PDF - 128K)

  • TP-201.2D: Post Fueling Drips from Nozzle Spouts; Revised Title: Post Fueling Drips form Nozzles (PDF - 151K)

  • TP-201.2F: Pressure Related Fugitive Emissions (PDF - 52K)

  • TP-201.1E: Leak Rate and Cracking Pressure of Pressure / Vacuum Relief Vent Valves (PDF - 38K)

PUBLIC HEARING NOTICE AND RELATED MATERIAL
  • Public Hearing Notice (HTML) or (PDF - 25K)

  • Staff Report: Initial Statement of Reasons (ISOR) (PDF - 202K)

    • ISOR App 1 - Proposed Amendments to California Code of Regulations (Reg Order) (PDF - 15K)

    • ISOR App. 2 - Proposed Amendments of Vapor Recovery System Certification and Test Procedures

      • D-200: Definitions for Vapor Recovery Procedures (PDF - 35K)

      • CP-201: Certification Procedure for Vapor Recovery Systems at Gasoline Dispensing Facilities (PDF - 195K)

      • TP-201.1: Volumetric Efficiency for Phase I Systems (BOTH PROPOSED AND REPEALED VERSIONS

      • TP-201.1B: Static Torque of Rotatable Phase I Adaptors (PDF - 40K)

      • TP-201.1C: Leak Rate of Drop Tube/Drain Valve Assembly (PDF - 89K)

      • TP-201.1D: Leak Rate of Drop Tube Overfill Prevention Device (PDF - 106K)

      • TP-201.1E: Leak Rate and Cracking Pressure of Pressure / Vacuum Relief Vent Valves (PDF - 37K)

      • TP-201.2: Efficiency and Emission Factor for Phase II Systems (PDF - 21K)

      • TP-201.2B: Flow and Pressure Measurement of Vapor Recovery Equipment (PDF - 302K)

      • TP-201.2D: Post Fueling Drips from Nozzle Spouts (PDF - 82K)

      • TP-201.2F: Pressure Related Fugitive Emissions (BOTH PROPOSED AND REPEALED VERSIONS)      

      • TP-201.2G: Bend Radius Determination for Underground Storage Tank Vapor Return Piping (PDF - 64K)

      • TP-201.2I: Test Procedure for In-Station Diagnostic Systems (PDF - 49K)

      • TP-201.2J: Pressure Drop Bench Testing of Vapor Recovery Components (PDF - 61K)

      • TP-201.7: Continuous Pressure Monitoring (PDF - 32K)

    • ISOR App. 3 - Vapor Recovery Health and Safety Code Statutes (PDF - 28K)

    • ISOR App. 4 - EVR Technology Review Report


INFORMAL REGULATORY ACTIVITY



Rulemaking Activity for 2002

preload